Landmark Skybox

Breeze-Courier | Taylorville, IL
Advanced Search
search sponsored by


The Weather Network
LOGIN | SUBSCRIBE






home : classifieds : notices November 23, 2020

Landing Page Browse Ads Search Ads Submit Ads
Items Wanted
Notices



How to use this form.
Found 4 records
Displaying 1 thru 4
Page 1 of 1

 AUCTIONS
 1
CLAIM DATE: Online Only Auction; Starting November 9th 2020 @ 6:00 PM and Ending November 30th @ 6:00 pm; Antiques, Collectibles, Tools, Furniture, Crocks, Toys, Collectibles & More; For catalog and bidding go to: https://micenheimerandmeyer.hibid.com; Preview November20th 4-6 PM; All items located at Micenheimer Auction Building@ intersection of 1250 E & 800 N. Rd, 4.5 Miles South of T-Ville on Christian County Hiway#1; Micenheimer & Meyer Auction Services—ISL:440.000896 & 441.002281; 217-820-9324 Jim— 217-710-5642 Cory
 LEGALS
 2
PUBLIC NOTICE The Region 3/District 5 office of the Illinois Department of Transportation has applied for an addendum incidental take authorization regarding Illinois State-threatened mussel species - Monkeyface (Quadrula metanevra) and Purple Wartyback (Cyclonaias tubercolata), and State-endangered mussel species - Rainbow (Villosa iris) and Wavy-rayed Lampmussel (Lampsilis fasciola). The application is based upon potential impacts resulting from in-stream work associated with proposed improvements to the structures carrying Interstate 74 over the Vermilion River near Danville, IL, Vermilion County Illinois. • The mailing address of the Region 3/District 5 office of the Illinois Department of Transportation 13473 IL Hwy 133, P.O. Box 610, Paris, IL 61944. • The project construction area is located on Interstate 74 over the Vermilion River near Danville, IL; more specifically located on Interstate 74 approximately 1.0 miles east of the Interstate 74/US-150 interchange in Danville, Vermilion County Illinois; Township 19 North, Range 12 West, NW/4, NW/4, NW/4, Section 14, 2nd Principal Meridian. • Construction activities associated with proposed improvements within the river will be limited to State Right-of-Way (ROW); State ROW is defined as that portion of the area lying 230 feet north of the centerline of I-74 and 235 feet south of the centerline of I-74 being approximately 1.38 acres. Temporary impacts may occur within the 1.38 acres with permanent impacts from construction activities being approximately 0.20 acres. IDOT has minimized the impact footprint within the species aquatic habitat to the extent possible; the estimated suitable mussel habitat within the project footprint is approximately 0.05 acres. • Authorization is being requested for incidental take of the following mussel species due to removal of existing sheet pile and existing rip rap around piers 2 and 3 of the structures carrying Interstate 74 over the Vermilion River: Monkeyface (Quadrula metanevra), Purple Wartyback (Cyclonaias tubercolata), Rainbow (Villosa iris) and Wavy-rayed Lampmussel (Lampsilis fasciola). The removal of the existing sheet pile and removal and replacement of existing rip rap will happen where mussels may occur. • Measures to be taken to minimize impacts to the fish include: • Siltation during all phases of construction will be minimized through use of proper soil erosion and sediment control measures such as floating silt fences to prevent sediment from entering the river. The resident engineer will inspect and ensure maintenance of all silt fences, silt curtains, and other erosion control structures. If site inspections show that measures in place are not functioning or are not adequate, different or additional measures will be added. If unforeseen observations or events pertaining to listed species are identified during construction, IDNR will be contacted. • During on-site work, the IDOT Resident Engineer will conduct daily inspections of the erosion and sediment control practices to ensure proper working order and maintenance. Additional inspections will be made immediately prior to and following events of heavy rain. If eroded soil is observed leaving the limits of construction, additional soil conserving practices will be installed, or measures taken to minimize soil erosion. • Per the terms of the original ITA for the project, at the request of IDOT, the INHS performed a freshwater mussel relocation in the Vermilion River (Wabash River drainage) at the Interstate 74 (IDOT FAI 74) bridges (IDOT Sequence No. 20639) in Vermilion County, Illinois. The mussel salvage was completed by INHS personnel during the week of 24 August 2020. During this salvage, freshwater mussels were collected by completing 138 multiple-pass 3.28 ft-wide transects over a 450-ft-long stretch of the stream directly under and adjacent to (both upstream and downstream of) the Interstate 74 (IDOT FAI 74) bridges. Seven species of mussels were collected from the salvage area, including I live Monkeyface. All live mussels collected were relocated approximately 1 mile upstream of the project area. • Compensation for the potential take of protected species will be considered by IDOT; IDNR will consider expenses already incurred by IDOT for mussel surveys and relocation by INHS and compensation previously paid for the fish species. • A copy of the Conservation Plan is available for review at the Danville Public Library, 319 N. Vermilion Street, Danville, Illinois 61832. A copy of the Conservation Plan is also available online at: http://www.dnr.illinois.gov/conservation/NaturalHeritage/Pages/Incidental-Take-Authorizations.aspx Incidental take Authorization #211 • Comments should be directed to: Illinois Department of Natural Resources Office of Resource Conservation Incidental Take Authorization Coordinator One Natural Resources Way Springfield, IL 62702 DNR.ITAcoordinator@illinois.gov • The comment period closes 30 days after the final publication of this notice that appears in the Commercial-News. Dates for publication are November 23, 2020, November 30, 2020 and a final publication on December 9, 2020. This notice will also be published in the Breeze-Courier and run concurrently with the November 23, 2020 posting in the Commercial News; the comment period closes January 11, 2021. 11/23/2020
 3
NOTICE OF LETTING Sealed Proposals will be received in the office of the County Engineer until 4:00 p.m. Tuesday, December 8, 2020 for the furnishing of gasoline/gasohol and biodeisel fuel required during the calendar year of 2021 and at that time publicly opened and read. Proposals shall be submitted on forms furnished by the County which may be obtained at the office of the County Engineer, and shall be enclosed in an envelope endorsed Christian County Fuel Bid. The right is reserved to reject any and all proposals and to waive technicalities. BY ORDER OF CHRISTIAN COUNTY HIGHWAY DEPARTMENT CLIFFORD D. FRYE, P.E. County Engineer 11/22, 11/23, 11/24, 22020
 
 PUBLIC
 4
ALCOHOLICS ANONYMOUS. Ph. 217-824-6072 or 217-824-3028 www.aaci11.org

 1

Using the Browse page
When browsing our classifieds, simply scroll down through the ads listed. If there are additional pages of liners, you may click on the Next, Previous, or page number to view more classifieds.

To select classified liners, click on the checkboxes next to the liner ads. You may choose the "View Selected" button to view the selected classified liners or the "Print Selected" button to print them.

Back to Top








Trinity Dodge Fixed
NewsWebPagesOpinionPeopleObituariesAg & BusinessSportsContact UsLife
Subscriptions | Username & Password Reminder | Change Password | Life

Breeze-Courier & Printing | 212 S Main St. Taylorville, IL 62568 | (217) 824-2233 |
website@breezecourier.com

© Copyright 2014 Breeze-Courier & Printing. All Rights Reserved.
Original content may not be reprinted or distributed without the written permission of Breeze-Courier & Printing.

Software © 1998-2020 1up! Software, All Rights Reserved